佐藤 一憲; 山路 哲史*; Li, X.*; 間所 寛
Mechanical Engineering Journal (Internet), 9(2), p.21-00436_1 - 21-00436_17, 2022/04
Interpretation for the two-week long Unit 3 ex-vessel debris cooling behavior was conducted based on the Fukushima-Daiichi Nuclear Power Plant (1F) data and the site data such as pressure, temperature, gamma ray level and live camera pictures. It was estimated that the debris relocated to the pedestal was in partial contact with liquid water for about initial two days. With the reduction of the sea water injection flowrate, the debris, existed mainly in the pedestal region, became "dry", in which the debris was only weakly cooled by vapor and this condition lasted for about four days until the increase of the sea water injection. During this dry period, the pedestal debris was heated up and it took further days to re-flood the heated up debris.
佐藤 一憲
Journal of Nuclear Science and Technology, 56(5), p.394 - 411, 2019/05
被引用回数:10 パーセンタイル:73.96(Nuclear Science & Technology)福島第一3号機の圧力測定システムでは、運転中の蒸発/凝縮を補正するためにその一部に水柱が採用されている。これらの水柱の一部は事故条件下において蒸発し、正しい圧力データが示されていなかった。RPV(原子炉圧力容器), S/C(圧力抑制室)及びD/W(ドライウェル)の各圧力の比較を通し、水柱変化の効果を評価した。これによりRPV, S/C圧力データに対して水柱変化の効果の補正を行った。補正された圧力を用いて、事故進展中のRPV, S/C, D/W間のわずかな圧力差を評価した。この情報を、3号機の水位、CAMS(格納系雰囲気モニタリングシステム)および環境線量率などのデータとともに活用し、RPVおよびPCVの圧力上昇・下降および放射性物質の環境への放出に着目して事故進展挙動の解釈を行った。RPV内およびRPV外の燃料デブリのドライアウトはこれらの圧力低下を引き起こしている可能性がある一方、S/Cからペデスタルに流入したS/C水がペデスタルに移行した燃料デブリによって加熱されたことがPCV加圧の原因となっている。ペデスタル移行燃料デブリの周期的な再冠水とそのドライアウトは、最終的なデブリの再冠水まで数回の周期的な圧力変化をもたらしている。